Tuesday, 28 October 2014

Shakedown

Final chance to prepare for the exhibition weekend, so the layout was fully assembled with all the stock for final testing...



A few little tweaks to iron out but nothing too major. A good opportunity to work out which locos suit which trains and tracks. A few more photos below...

















Every spare piece of siding space will be in use and still some stock will have to be left in the boxes (but nowhere near as much as with the previous layout!)

We've got the layout running really well and there were no casualties or unexpected problems.

Hopefully it'll be an enjoyable weekend.


Sunday, 12 October 2014

Build costs

I never kept a running tally of the cost of building the new layout - probably just as well but having discovered that Ebay keeps a purchase history I started totting up the expenditure.

In Ebay purchases alone, that's mainly the electronic gubbins, board dowels, feet, latches and scenery like the extra platforms, tunnel mouths and modrock,  the total comes to £504.10.

That figure doesn't include the cost of all the timber, the four litres of PVA glue, ballast, grass or sahara beige paint. Thankfully the track was recycled from the old layout, with any extras being liberated from the loft layout, which is now reduced to a single, small running loop of 12ft x 4ft!

Then there's the cost of having to buy new racking as the old arrangement failed, causing the new layout to crash onto the car, then there's the cost of the damage to the car...


Thankfully everything is now repaired but this is a day I wont forget in a hurry. Thankfully the layout escaped pretty much intact apart from a few crushed pieces of track, a bent signal and losing one of the suitcases from one of the platforms (the four litres of PVA glue probably helped)

In the interests of fairness I wont factor in the cost of the car or the new racking, even so I anticipate a final build cost of nearly £1000!

I wont be scrapping this one in a hurry..

Monday, 22 September 2014

Bubble car & (finally) restored the VEP


On the right - my latest acquisition for the new layout, this will run on the shuttle loop in the smaller platform. Sadly HD never made any single car units but this Hornby version will be used as a demonstration that modern stock can be made to work. Current pickup is via a Marklin skate that just about fits underneath and current return is via all eight wheels.

And on the left - After almost two years, the VEP is repaired!

My previous attempts to repair ended up causing more problems than were resolved. In the end I snapped off the top of the motor housing and lost both power pickups from the motor bogie. Spares for these appear to be hard to source at the moment so when a scrap motor chassis appeared on the internet, I snapped it up. Thankfully the parts remaining on the scrap chassis were all the bits I needed to finally resurrect this thing!

Current draw initially was just under half an amp, quite high for modern stock. This settled down to about 0.3amps but still doesn't run anywhere near as nicely as the Bachmann multiple units. Quite a bit of rolling resistance is notable on the unpowered carriages and the rubber tyres make the motor bogie rise up when starting from standstill. I also had to remove the front and rear couplings to stop it from derailing on corners, I gather from some internet research that this has been a problem for other users. I'd love to run this in multiple with the CEP but I'll need a way to couple it and then I'll need to find a way to slow down the CEP to avoid wheel slippage.

Nice to finally see it in action, just needs a good clean up, it's covered in dust!


Wednesday, 10 September 2014

New layout: Revisiting the checklist

In one of my first posts regarding the new layout I wrote a checklist of things I wanted, stating that I'd be happy if I achieved everything on the list.

So...

Faster setup with more fixed track - DONE (set up in under 40 minutes, pack down 30)
Platforms can be fixed into position - DONE (only 2 ramps loose-fitted)
Platforms and buildings can be illuminated - DONE (all buildings illuminated)
Signals fixed in position and permanently wired - DONE (and converted to LED)
TPO fixed into position and permanently wired - DONE
Raised track, independent of the two loops - DONE
End-to-end terminus running - DONE (automated shuttle and points control)
Ability to run four trains plus shunting duties - DONE
Use of tunnels, bridges and scenery - DONE
Reinforced boards that won't warp in storage - DONE
Increased siding space at rear of layout - DONE
One person operation more practical (standing behind layout, not inside it) - DONE
Self-supporting legs, not running on tables - DONE (layout now 1 metre high)
Able to use the Märklin turntable - DONE

Impressive!

One issue that has come to light is that the 9 pin breakout PCBs we used to join the front and rear sections together are significantly weaker than the 37 pin versions used on the rest of the boards, they struggle to line up, wont stay in position as they're only held in by two screws and because the front and rear sections tend to be connected at an angle, I struggle to connect them. I've ordered two short extension cables and will relocate the breakout PCBs away from the board joins and use the cables to connect. This will take about 5-10 minutes off the setup time (hopefully).

Monday, 8 September 2014

New Layout: Final testing

After spending more than a few hours tweaking tracks, sorting dead spots and track shorts, and trying to level the tracks to avoid the annoying uncouplings, we finally set up the layout for an evening purely to run it for ourselves.

However we discovered that the floor of the hall we were using wasn't particularly level, which resulted in a couple of high spots. I'll resolve this by purchasing some adjustable feet to fix to the bottom of the legs.

It became clear that the speed of the locos on the shuttle is a problem, ie if we use two trains on the auto changeover, they will need to operate at a similar speed to avoid either crashing into the buffers or stalling mid-journey. A few combinations were tried, even the two Bachmann EPBs have massive variances in performance and wouldn't run together that well.

The CEP finally got an outing, normally this one gets left in the roof due to the amount of space it takes up but it seemed really at home on the upper loop so we'll definitely be using this for the exhibition.

Brighton Belle caused us no end of problems during the last testing session, having been gifted some Wrenn pullman coaches I've replaced the couplings on the two end cars, these stayed coupled and ran faultlessly all evening.

I think the layout is now about as perfect as it's going to get, there will always be gremlins - after all this stuff is over fifty years old now and never designed to be incorporated into a scenic layout like this. The control panel with its shiny new ammeters also performed really well and I'm pleased that I spent the time changing to analogue dials.

And that's pretty much it for now. Next and first proper outing for the layout is at the end of October, one week prior to the exhibition. We decided that no further work is required and the small things like fitting buffer stops, adjustable legs and half fish plates can all wait until then.

We achieved what we set out to do - build a layout in time for the exhibition in November, and we've done it!

Now we can relax for a while.










Sunday, 7 September 2014

New layout: Fame at last!

The whole purpose behind building the new layout was for an exhibition that we'd been asked to do in November 2014 (and already we've had two requests to exhibit elsewhere in 2015!)

Since joining the model railway club and taking the layout to some of the sessions to work on it, we've attracted a fair amount of attention (all good) and we're now featured on the Weymouth Model Railway Club website, a write-up has also been submitted to Railway Modeller, who have also apparently expressed an interest in what we've been doing.

A very nice little write up including some stunning pictures taken by one of the club members can be found here:

http://www.weymouthmra.org.uk/layouts/members/i-ad-that-andy-and-steve-miller/

New Layout: Ammeters

I decided to revisit the control panel as one of the ammeters kept showing a current draw of over 7 amps.


This caused some major concern when it first appeared on the display. For starters it shouldn't be possible for a Duette transformer to tolerate that kind of current draw for more than a few seconds - this went on for considerably longer. Thankfully I soon realised that both tracks were actually running perfectly and quickly deduced that the problem was with the gauge itself.

When I designed the panel I already had the two ammeters that I'd intended to use in the loft and as there was only two, there was no provision made for more, even though there are four controllers. A few issues with the upper loop, combined with the realisation that we could actually use the top loop for much longer, double-headed trains made me realise that we should consider installing ammeters for every controller.

The digital ammeters also don't really suit the vintage 1950s look, plus they have to be wired between the output and the track, wiring between rectifier and controller is preferred as this would measure current irrespective of the direction of the train but these digital meters just wouldn't work in that formation and they can't measure negative current.

I needed a better solution so I went back to basics, analogue meters - nothing wrong with a big needle swinging across a dial face!

After hours of searching I couldn't find a design I liked, the ones I did like didn't have the range I was looking for, I know it's possible to adjust this but this would be more time-consuming. In the end I bought a set of cheap gauges and decided to have a bash at creating a bespoke dial face.


Very cheap looking, and that's because they are cheap! Also they look relatively easy to dismantle.


...And they were! Here the faces have been removed and turned around so that I have a blank face ready for my bespoke design.


A quick scan of the original dial face gave me a design template to work with, after some colour and bespoke graphics, including adding the name of each track circuit via the totems, I had the design printed, again onto self-adhesive vinyl.


Same problems with inkjet printing on vinyl, very hard to smooth out the bubbles. After this picture was taken I stripped the dial again and smoothed it some more before final drilling into the control panel.


Thankfully I kept copies of all the files when I made the original graphics, I had to reprint the section behind the dials as most of it was destroyed during the drilling process.

These dials, to fit them snugly, require some pretty large round holes, I used a wooden hole saw to do this, it took ages and it's fair to say the hole saw wont be making many more holes now (but it did the job!) after drilling more holes to secure the gauges, I bolted them into position and then made a wiring loom section using more pluggable connectors so that the panel is still completely removable for onward maintenance.

The whole thing was then taken over to the layout for final testing - thankfully everything works and I now have ammeters that read in both directions, they also seem more accurate and react quicker to potential issues, vitally important stuff.

Wednesday, 3 September 2014

Tuesday, 26 August 2014

New layout - FINISHED!!!

Well...

We did it!

We finally have a working layout.

Another lengthy all-day session got us to completion within five months.

The cost, I haven't dared calculate, the man hours, obscene!

Our 16ft x 5ft show layout has three running loops including the upper loop and an electronically controlled shuttle, which now also throws the points at the terminus station, which alternates the locos along the branch. I figured that if I added a pulse operated relay (one pulse on, one pulse off) that this would work the points motor, getting the signal from the shuttle module proved more difficult however as the only outputs are via the power feeds for the LED signals. I did however work out that if I wired a transistor to the green signal connection, this would then operate a relay, which in turn would generate the signal to operate the points. A bit over-engineered but it does the job!

This is the first picture of the layout after we finally agreed that we could call it finished...



Buildings illuminated, model cars in place...


Just a couple of minor niggles with the track dipping in places but the layout still ran.


Brighton Belle found all the imperfections, the track and the Brighton Belle have since been modified...


It is sad the the old layout had to be broken up in order to produce this one but there was clearly no way that I could safely store both layouts and there was no way that it would ever have been used once this one was completed. Plus the boards were degrading badly and setup could take upwards of three hours - this one is running within 30 minutes (we timed it!)

I've ticked all the boxes from the initial design brief and attracted a fair amount of attention along the way.

This has been a very tiresome five months. I don't know if I'd do this again. We wanted to do something extraordinary with the old table top railway design while remaining as faithful as possible to the original Dublo designs and I think we've done that and more besides. I hope the efforts that have gone into making this layout by my brother and I really show come our first exhibition. I can't wait to get all the stock set up and run it properly!!!

Time to relax...


Sunday, 27 July 2014

New layout: Snagging

Had another opportunity this week to set up all six boards together with a view to designing the rear section of the upper loop but also to play with the layout and identify any faults.

The rear section has now been fabricated & painted and awaits final assembly and wiring. Several people suggested that the rear section would benefit from its own siding so that a second train could be stored so this was incorporated into the design.

A small back board has been created for the length of the front three boards, sadly its height means that it's impossible to run the layout from the back and be able to see what's going on, so the layout will have to be side-operated.

Although the 0-6-2 tank engines seem to be the most temperamental locos and therefore were considered the best test locos, we hadn't foreseen that it would have been prudent to test with a larger loco - had we done so we would have found out much earlier that the hit the platform of the main station as they exit the tunnel. A spare platform ramp has been re-modelled by shortening the ramp and rounding off the sloping edge, this has now been primed and painted ready for fitting, which should overcome the problem.

We also discovered that there has been some slight warpage in the front sections, boards one and two being the worst affected. Although no derailments, there's quite a jump between the boards which may be cured by adjusting the legs, currently all the legs are at a fixed position but it appears that some adjusters would be beneficial.

Finally it was suggested that it would be very clever if, as part of the auto shuttle, the points at the village station could also be automated to let a different train out each time. After careful consideration I think I've found a way to do this using the existing shuttle module and some creative engineering...

Saturday, 19 July 2014

New layout - All in a day's work, part five

On one of the hottest days of the year so far, we decided to have an impromptu day on the layout to try and push things forward to a conclusion.

First job was to construct the legs, the layout now sits at just over a metre high, which is perfect working height for me!


Once all the legs were finished we assembled all six boards together and I was able to work on some of the minor electrical gremlins, like why the shuttle signal at the main station end didn't work (because I hadn't connected it underneath) and why the shuttle stopped short of the station (because I hadn't wired that either!)

Having the boards on legs meant that I could figure these problems out without disconnecting the boards and flipping them over. Discovered that the green aspect of the shuttle signal wouldn't work and this is an internal fault on the signal so I'll just replace it and repair the other one at my leisure.


Some issues with track alignment on the rear fiddle yard. I had expected a problem here due to the way that I'd hastily laid the track, most of the issues were resolved relatively easily but some of the tracks that had to be cut across the board joins will need further attention and a dab of epoxy on the centre rails to keep them in place.


Although we were testing on a slope, the shuttle and two main loops performed well.


The village station needs a building and footbridge, I have spares in the loft but the bridge will need to be painted to match the rest of the sahara beige buildings.


The only major project remaining is to complete the upper loop.


Considering that this layout was only planned in March, we think we've done pretty well to advance to this stage. We wanted it ready by October!

No further all-day sessions are deemed to be needed now.



Of course I had to take a video of the first trains running the entire layout for the first time:









Friday, 18 July 2014

Two more fixed


Finally got around to replacing the broken coupling on Cardiff Castle, only took me nearly two years to resolve!

Also sourced a replacement body for one of the 8Fs, this will pair up nicely with 80158. Then found a front bogie in the spares box with a front coupling so that I can double-head the two 8Fs together. Here Cardiff Castle and the re-bodied 8F are doubled up for testing.

I intend to show the new layout with a complete set of working locos, the Gresley teak coaches were given to me ages ago and are in poor condition, they don't run that freely and the roofs are rusting. Hopefully a light lube and a respray of the coach roofs will suffice but for testing locos under load they worked fine.

Wednesday, 16 July 2014

New layout: Lights

I decided to illuminate some of the buildings, so purchased a 2 metre reel of Yellow LED strip.


This stuff is pretty cheap, looks to be waterproof and can be cut every 3 LEDs. 

After experimenting with different positions, for the signal boxes I opted to fix the strips along the side of the box.





The effect when illuminated is pretty good.


For the island platforms, a single three LED strip will do.


Not bad.


And for the larger station, two sections.


Thankfully I wired the layout with a switched 12v bus wire for lighting purposes. I opted for LED over grain of wheat bulbs as LEDs require less maintenance, as these platforms are being ballasted into position they would be difficult to remove if a bulb failed. This seems to be a much simpler option and the yellow LEDs give a nice retro look!