Tuesday, 26 August 2014

New layout - FINISHED!!!

Well...

We did it!

We finally have a working layout.

Another lengthy all-day session got us to completion within five months.

The cost, I haven't dared calculate, the man hours, obscene!

Our 16ft x 5ft show layout has three running loops including the upper loop and an electronically controlled shuttle, which now also throws the points at the terminus station, which alternates the locos along the branch. I figured that if I added a pulse operated relay (one pulse on, one pulse off) that this would work the points motor, getting the signal from the shuttle module proved more difficult however as the only outputs are via the power feeds for the LED signals. I did however work out that if I wired a transistor to the green signal connection, this would then operate a relay, which in turn would generate the signal to operate the points. A bit over-engineered but it does the job!

This is the first picture of the layout after we finally agreed that we could call it finished...



Buildings illuminated, model cars in place...


Just a couple of minor niggles with the track dipping in places but the layout still ran.


Brighton Belle found all the imperfections, the track and the Brighton Belle have since been modified...


It is sad the the old layout had to be broken up in order to produce this one but there was clearly no way that I could safely store both layouts and there was no way that it would ever have been used once this one was completed. Plus the boards were degrading badly and setup could take upwards of three hours - this one is running within 30 minutes (we timed it!)

I've ticked all the boxes from the initial design brief and attracted a fair amount of attention along the way.

This has been a very tiresome five months. I don't know if I'd do this again. We wanted to do something extraordinary with the old table top railway design while remaining as faithful as possible to the original Dublo designs and I think we've done that and more besides. I hope the efforts that have gone into making this layout by my brother and I really show come our first exhibition. I can't wait to get all the stock set up and run it properly!!!

Time to relax...


Sunday, 27 July 2014

New layout: Snagging

Had another opportunity this week to set up all six boards together with a view to designing the rear section of the upper loop but also to play with the layout and identify any faults.

The rear section has now been fabricated & painted and awaits final assembly and wiring. Several people suggested that the rear section would benefit from its own siding so that a second train could be stored so this was incorporated into the design.

A small back board has been created for the length of the front three boards, sadly its height means that it's impossible to run the layout from the back and be able to see what's going on, so the layout will have to be side-operated.

Although the 0-6-2 tank engines seem to be the most temperamental locos and therefore were considered the best test locos, we hadn't foreseen that it would have been prudent to test with a larger loco - had we done so we would have found out much earlier that the hit the platform of the main station as they exit the tunnel. A spare platform ramp has been re-modelled by shortening the ramp and rounding off the sloping edge, this has now been primed and painted ready for fitting, which should overcome the problem.

We also discovered that there has been some slight warpage in the front sections, boards one and two being the worst affected. Although no derailments, there's quite a jump between the boards which may be cured by adjusting the legs, currently all the legs are at a fixed position but it appears that some adjusters would be beneficial.

Finally it was suggested that it would be very clever if, as part of the auto shuttle, the points at the village station could also be automated to let a different train out each time. After careful consideration I think I've found a way to do this using the existing shuttle module and some creative engineering...

Saturday, 19 July 2014

New layout - All in a day's work, part five

On one of the hottest days of the year so far, we decided to have an impromptu day on the layout to try and push things forward to a conclusion.

First job was to construct the legs, the layout now sits at just over a metre high, which is perfect working height for me!


Once all the legs were finished we assembled all six boards together and I was able to work on some of the minor electrical gremlins, like why the shuttle signal at the main station end didn't work (because I hadn't connected it underneath) and why the shuttle stopped short of the station (because I hadn't wired that either!)

Having the boards on legs meant that I could figure these problems out without disconnecting the boards and flipping them over. Discovered that the green aspect of the shuttle signal wouldn't work and this is an internal fault on the signal so I'll just replace it and repair the other one at my leisure.


Some issues with track alignment on the rear fiddle yard. I had expected a problem here due to the way that I'd hastily laid the track, most of the issues were resolved relatively easily but some of the tracks that had to be cut across the board joins will need further attention and a dab of epoxy on the centre rails to keep them in place.


Although we were testing on a slope, the shuttle and two main loops performed well.


The village station needs a building and footbridge, I have spares in the loft but the bridge will need to be painted to match the rest of the sahara beige buildings.


The only major project remaining is to complete the upper loop.


Considering that this layout was only planned in March, we think we've done pretty well to advance to this stage. We wanted it ready by October!

No further all-day sessions are deemed to be needed now.



Of course I had to take a video of the first trains running the entire layout for the first time:









Friday, 18 July 2014

Two more fixed


Finally got around to replacing the broken coupling on Cardiff Castle, only took me nearly two years to resolve!

Also sourced a replacement body for one of the 8Fs, this will pair up nicely with 80158. Then found a front bogie in the spares box with a front coupling so that I can double-head the two 8Fs together. Here Cardiff Castle and the re-bodied 8F are doubled up for testing.

I intend to show the new layout with a complete set of working locos, the Gresley teak coaches were given to me ages ago and are in poor condition, they don't run that freely and the roofs are rusting. Hopefully a light lube and a respray of the coach roofs will suffice but for testing locos under load they worked fine.

Wednesday, 16 July 2014

New layout: Lights

I decided to illuminate some of the buildings, so purchased a 2 metre reel of Yellow LED strip.


This stuff is pretty cheap, looks to be waterproof and can be cut every 3 LEDs. 

After experimenting with different positions, for the signal boxes I opted to fix the strips along the side of the box.





The effect when illuminated is pretty good.


For the island platforms, a single three LED strip will do.


Not bad.


And for the larger station, two sections.


Thankfully I wired the layout with a switched 12v bus wire for lighting purposes. I opted for LED over grain of wheat bulbs as LEDs require less maintenance, as these platforms are being ballasted into position they would be difficult to remove if a bulb failed. This seems to be a much simpler option and the yellow LEDs give a nice retro look!

Monday, 30 June 2014

2 days later...

Since Saturday, board three has been indoors with me so that I could correct a minor issue with a set of points, as well as adding the additional relay pcb for the shuttle loop changeover (to avoid it interfering with the other lines)

After working on boards five and six this evening, I've now finished wiring all six boards (and used nearly a whole drum of alarm cable!) we should be in a position now to test them all together and run the two main loops, shuttle and sidings - just need to finish tracklaying on the upper loop and construct the supports for the back of the upper loop.

We also need some legs for the boards to stand on, having them on low tables causes back ache!

These arrived while we were away working on the layout, there should be sufficient platforms here to finish the village terminus but these are in a really poor state. Ideally they should have had a night in an oven cleaner bag but instead I settled for sanding and priming.


This is a much more cost-effective way of buying platform sections, this lot cost me a tenner.

It's worth bearing in mind that the platform base used on the island station and main station building (like the one in the photo) are essentially the same as those very expensive platform extensions. Really the only difference is that holes haven't been drilled in them. If you look at them from underneath, the mouldings are identical on each type so a little time and effort, elbow grease, primer and sahara beige paint saves a small fortune.

Also placed an order for LED strips, I've gone for yellow as I think this will compliment the old Dublo colours, the intention is to illuminate the signal boxes and stations if possible.

It's a relief to have all the wiring done, adding the LEDs will be simple as all the connections have been put in place. Time to chill for a while...



Sunday, 29 June 2014

New layout: All in a day's work - part four

Another long day of work, most of the work this time is electrical so there isn't much to see, however board two has now been wired in its entirety, which took nearly six hours to complete!

All six sections were brought in, but this time it was felt that there was no need to join them together until later in the day when the electrical work was completed.


The newly painted signal box was placed back into position.


Board three scenery is now virtually complete.


Looking down from left to right.


The rear fiddle yard sections.


After eight hours of work, the trusty green EPB came out for testing again, the three front boards were joined together and were powered for the first time using the 37pin connectors in each board.
Found an earth fault between boards one and two which, thanks to having made detailed notes and diagrams, was quickly found and resolved.


Looking up the up loop towards the TPO, the new LED signals shine brightly in the distance.


The third signal was added during this session, this one activates when either of the points on the up or down tracks is activated, later on I will also add a track isolator as a fail-safe.


Looking further up, the level crossing, shuttle signal and signal box. Sadly the shuttle signal refused to work and as I forgot to bring a test meter, I was unable to resolve the fault.

 

Signals at the end of the platform, the LEDs are really bright.


 From this angle it's possible to see into two of the tunnel mouths, the single bore tunnel will eventually link into the fiddle yard at the back, creating a run-round loop.

The track in the foreground is the shuttle loop, now totally isolated from the main loops via two additional relay controllers.


 Not much work done at this end, still waiting for more platforms. This board had already been electrically tested at home but all the electronics for the front boards are wired via this board!


We decided that another signal box wouldn't look out of place here.


Two girder bridges, repainted and separated from their bases (as they are too tall to remain in-situ)



Looking down from right to left - the upper loop starting to take shape, we were able to shuttle the EPB up and down to test it. 



Having taken board three home to work on separately, I have now repaired the only pair of points that refused to operate, all other points, isolators and the turntable control all function perfectly. 

Scenery is pretty much complete, next task is to complete the upper loop, wire and lay the remaining tracks for the fiddle yard and then test all six boards together.

Some minor work is required to the signals to stop the light shining through the back of them.

Another all-day session required at least but the deadline is a long way away. We're confident that we can finish well before October - at least all the tracks here (apart from the turntable which hasn't been tested yet) are working.


Friday, 27 June 2014

New layout: A few progress pics...

As we go into another all-day session tomorrow, here's the progess so far...

Village terminus waiting for platforms to be installed.


The track bed of the upper loop is visible here.


At the end of the last all-day session, this was a collection of pieces of polystyrene glued into place.


The Peco tunnel mouth, looking very fetching in Sahara Beige, with added foliage.


More scenery added.


 Looking into the tunnel at the terminus end.


The scenery here between the tracks has been cut back to allow for a signal box.


Looks like two signal boxes cut and stuck together - and that's exactly what this is!





More scenery added on the approach to the Peco tunnel mouth, the small space between the scenery & TPO allows for an additional signal to be fitted.


The finished wiring under board one.


Testing the shuttle circuit using board one only - the signal works and the Bachmann EPB looks quite at home!


Viewed from the tunnel mouth.


I needed more platform extensions, these are very expensive!
Thankfully I found and won these from Ebay having been repainted at some point previously...


...Just a quick rub down and repaint was all that was required.


Signal box removed for painting.


Signal box primed and painted, just needs the doors & windows painted. 


Board four - first of the rear boards to be wired and finished, with just a few sidings...


With summer upon us, we're hoping to avoid more full days after tomorrow. The hope is that by the end of tomorrow's session, most of the work will be completed - if only minor scenery work is required then this can be done without joining all the boards together.

By my calculations, we're four months into this little project... not bad progress I think.