Sunday, 5 May 2013

Pictures from 4th May weekend

Taken with a camera phone as I can't find my camera:

Rear sidings, 0-6-0 Diesel shunter at the head of a goods train with Crepello on the front of a rake of Pullman coaches.
The damage to the shunter still hasn't been repaired but coupled up in this fashion it was hard to see the missing chunk of bodywork and rear buffer.

Co-Bo heading the mail train.

Steam sidings and Diesel sidings in the  background. The Diesel sidings are a new addition as we added the new, wider base boards during the last maintenance session.

Impressive line up of steam, while the repainted Southern 4MT 2-6-4 rushes round the corner.
All of these locos worked!

Same view, the EMU is parked in the far siding taking a break.

The Bachmann DMU, by this time the two carriages had been cable tied together!


Another view of the Diesel sidings, viewed from the front of the layout.

Taken from the same spot, the switches control the points, signals and track isolation through the main station.

Better view of the switch panel, each track through the station has two isolated sections.

Goods train waits in the isolated section, it's parked behind a passenger service. There is another line immediately to the right which can't be seen here. The 2 EPB's also wait at the signal while the mail train goes for a spin.

Co-Bo approaching with the mail. (mailbag waiting on the hook)

Front view of the EPB from the track.

Two of the Four running rails through the station, green signal ahead.

Waiting for the mail train...

Other side of the main station, the rear of the green EPB on the left. The passenger service on the right is parked up with the goods train immediately behind it.

Twin EPB's wait for a green signal, priority still for the mail train.

Better view of the main station. There's a footbridge and level crossing to come...

Nice to have all the steam locos out.

Looks a bit sparse here but several of the Diesel locos were out on duty elsewhere on the layout. The Two A3 controllers on the right control the two running loops. All the track in the siding here is loose-laid.

Rear station. The line occupied by the Pullman can be accessed from either running rails via the points and crossover in the distance.

Pointwork and crossover at the end of the station.

Canadian Pacific - the most expensive item in my collection, was used very carefully throughout the weekend and performed well. Due to its cost and condition it doesn't get much use.

DMU, SR EMU & Pullman Express having a rest.

Can't see the damage to the shunter!

Same position, the shunter's been joined by the other goods train, the Pullman has been moved into the siding and the 0-6-0 has been just backed in the coaches to make the 10 car rake (which it couldn't pull)

Two Class 20 Bo-Bo's making light work of a 10 coach train.

The portable layout. 10ft x 16ft of toy train porn.

The rear station and sidings viewed from outside the layout with the Two Bo-Bo's flying through the station.


Successful weekend

2 days of successful running on the portable layout.

Two class 20s at speed hauling 10 tinplate coaches.

Everything worked apart from one pair of electric points which overheated, not sure why and didn't really cause any major issues.

Silver King proved to be a bit sticky so I'll so how it runs on the loft layout before I strip it down and the only other casualty was the SR EMU, which just stopped. Thankfully it was nothing more than a broken wire and was soon back up and running and sounding really smooth, one of the nicest runners of my entire collection.

I was also very pleased with the performance of both Bachmann EPBs, I took the decision not to take the CEP as I was concerned with siding space issues. The A3 controllers aren't great for these, singularly you have two speeds - off and fast but doubled up they were fine and considering that both have only just received their Marklin skates, I'm impressed that they never once derailed or stopped. Points and crossovers also not a problem.

Also ran the Bachmann DMU, the two cars kep separating so these ended up being cable tied together. These also suffered with excessive speed problems so weren't run for long. Once the other green DMU is 3 railed I will consider doubling these up if I decide to use them on the portable layout.

There was some debate as to whether we should run any new non-Dublo items on the display layout but agreed that a few examples of what can be achieved wouldn't hurt. They do run exceptionally well and the clickaty-clack sound on tinplate track is very authentic and needs to be heard!

Double heading worked pretty well but I found that the 2-6-4 tanks worked better when doubled up with an 0-6-2. This was the case with all 3 of the 2-6-4s.

Towards the end of the day I put 10 carriages behind 2 of the class 20 Bo-Bo's. whilst this doesn't sound too great an achievement it's worth bearing in mind that the tinplate coaches, as well as being quite heavy, also tend to offer a fair bit of rolling resistance even though the wheels were lubed on every coach. Some of the steam locos couldn't pull them but the two 20s with their new tyres managed this with ease and looked quite spectacular.


Friday, 3 May 2013

A quick lap with the green EPB

Fitted a new skate under the green EPB, so took it for a quick lap round the layout before boxing it up ready for the weekend run on the portable layout.

Excuse the mess, the layout is still very much work in progress.

The first 10 seconds of footage can be ignored, the train wasn't on the track properly.


Monday, 15 April 2013

Playing with SCARM


The last time I tried using SCARM I didn't get very far with it - I found it hard to understand, unusual for me as I consider myself to be reasonably computer-savvy. Just couldn't get to grips with it so gave up pretty quickly and went back to designing in my head.

Having seen so many positive reviews from different people I decided to take another look and downloaded a newer version. Reason being is that I think my idea for the loft layout is a bit boring and doesn't make sufficient use of all the available space.

This was my first attempt this evening using SCARM, nice to see that it not only has all the 3 rail Dublo track system, it also had the Marklin turntable.

Admittedly the tracks don't line up properly in places but I can overcome this in real, this is what I have in mind, this is based roughly on the dimensions of the loft. I'll need to measure it again before I start ripping up tracks...



The current design (which I haven't drawn on SCARM) is basically a square layout with a terminus in the centre, which is accessed via a triangular junction. This proposed design gives me an additional track through the centre of the loft, I can add a narrow board along the centre joist support to provide this and this will give me a longer route than I currently have. Down side is that this design doesn't give me a terminus, unless I can figure out a way of adding a raised section and mount this above the existing track work. 

The one thing I really like with SCARM is that once you've finished designing, it will generate a list of the items needed to construct the layout.

It's still early days but I'm slowly getting the hang of this!


Thursday, 11 April 2013

Turning the table

After a light oiling and a quick test, I turned my attention to the broken turntable switch.

The original Marklin switch, as well as being broken, will look quite clumsy when installed on the layout, so I divised a simple circuit, using a latching relay and 2 diodes so that I can use a normal spdt  toggle switch to control direction and send a pulse signal to start the turntable moving.

After about 20 minutes, I came up with this...

The switch is a momentary on-off-on toggle switch, although it looks to be switched in one direction, it's actually in the centre off position. I'll find a better switch!
...works perfectly, controls the turntable in both directions. Turntable indexes a treat. I'll hide the circuit under the board and while I'm at it I will redo the terminals on the turntable itself, hiding the connections underneath, rather than using the original connector plugs supplied. The only visible component will be the toggle switch, much neater than this...



Sunday, 7 April 2013

Märklin turntable

This arrived during the week...


Haven't had a chance to fully test it yet but it appears to have a defective control switch.

There's some minor warping to the plastic casing which is stopping one of the contacts inside from reaching the other. I could try to heat it back into position but I have a plan to control this using a toggle switch, via a latching relay and a couple of diodes. This will look much neater than the current arrangement, which is rather large, unattractive and clumsy looking when all the wires are connected.

I could have spent hours butchering a genuine Dublo turntable, fitting a motor & gearbox etc but this thing has all those gubbins already installed, plus it should stop at every track, something that would have taken me days to figure out.

I'll probably use it in the loft layout as my planned turntable position isn't that easy to reach, this will eliminate the problem of having to reach over to turn the locos and of course gives me 6 roads rather than the standard Dublo 5. Plus it gives me more scope with the design of the approach to the turntable, might even be able to design a run round loop from this.

I'll post more pics when I've constructed the switch mechanism and installed it but for now I'm happy to have finally tracked down one of these.

Tuesday, 2 April 2013

Finally got a proper workbench

...well kind of.

Having purchased a new desk for the home office, I've relegated my old one, which was basically some kitchen cupboards minus the feet with a side panel for a desktop, to the roof. This gives me a dedicated (but cramped) area to work on the locos properly and means I can set up the vice, soldering station, Dremel and a small test track, whilst removing the dumping ground / test track that had become the centre of the layout.

This was my first proper trip to the loft since all the work we did on the portable layout in February. Basically I'd spent so many hours that I'd sort of lost interest in it all, plus the weather's been too cold.

Hopefully with the new work area I can get cracking with the loft layout, I now have sufficient track for both layouts so no more pilfering of the loft layout, I can get on and build the damn thing.

To test my new workstation I revisited my Bachmann DMU that I'd converted ages ago but was never  overly happy with its running. The driving motor coach is much lighter than the newer EMUs and that, combined with the resistance from the Marklin skate, caused slippage and derailments on corners. I managed to modify the pickup, removing the original Marklin backing to the skate and soldering it straight onto a small peg board, which is then screwed to the bogie. Removing the backing piece moves the skate a few crucial millimetres upwards, reduces the tension and stops the derailments and slipping.

Job done...


Monday, 25 February 2013

A casualty...

The planned weekend didn't go ahead due to illness, so instead we took the opportunity to finish all the outstanding work on the portable layout and then decided to construct two new 4ft x 2ft hinged boards to accommodate more sidings and replace the narrow section of track leading to the turntable & sidings.

I was never happy with the arrangement crossing into these sidings as it always left a piece of straight track without a board to fix it to and a girder bridge won't fit in the available space. Also after the previous streamlining it provided very little running space within the sidings which made it difficult to move the locos around without coming onto the main running loops. The new boards then required all the electronics and wiring to be transferred from the old ones, wires extended, new holes drilling etc. In short, after two days of work we managed about 30 minutes of running before it was time to dismantle everything and put back in the car.

Had major issues with the timber supports of the boards warping. Although it's always been a problem, this time it proved to be a right pain, particularly now that the boards are hinged together as there are some pronounced high spots on the edges which make track alignment very difficult. Once we finished we screwed the unhinged ends together in an attempt to straighten them out. I'll find out on the next run if this has been successful!

Sadly during the course of testing the finished wiring on the main station boards, I managed to drive the diesel shunter straight off the end of the board after hitting the wrong switch. It fell and hit the ground on its rear end, snapping the rear buffer, destroying the steps on one side and put a large crack in the rear. Not happy :(

Although it still runs, it doesn't sound good and then started to stutter & hesitate so I'll strip it and see what's going on. So I'm now on the lookout for a new shunter body.

Also had a very close shave with the SR EMU, it wasn't negotiating the corners, which was later found to be due to a trapped wire, but it too managed to come off on a bend and hit the floor, thankfully and miraculously the motor coach wasn't damaged and was fixed in minutes.

On the plus side, I've now got plenty of siding space for all the running stock, hopefully when we do the public display later in the year I can get everything out and running. I'll just have to park the shunter somewhere where the damage can't be seen!

Saturday, 16 February 2013

The postman came...

I've now taken delivery of a replacement body and tender for my Silver King, along with a very nice City chassis that was sold as spares or repairs, and finally a very interesting repainted Duchess of Rutland. I also managed to replace the front coupling on the Southern repainted 2-6-4.


City of Birmingham has been in the collection for a few years but its total running time can be counted in minutes - it made one appearance on the portable layout one evening before it expired. It started life as a very poor City of London, which I bought as part of a biscuit tin full of scrap locos, Silver King was in the same tin!

I sourced the new body and tender as the old one was beyond saving, sadly though the wheels, axles and rod pins also turned out to be badly worn, it threw the rod pins after only a few laps of the layout, one of the wheels also fell off shortly afterwards so the loco was abandoned and left in bits - I've been scouring the Internet on and off ever since trying to find a reasonably priced chassis. The one I eventually found was totally seized, all 3 axles jammed and valve gear stuck but thankfully the armature checked out fine. A throrough clean, grease, oil, commutator clean and neo magnet (I "borrowed Sir Nigel's magnet) and within 30 minutes of arrival it was up and running with the nice shiny body and tender.


The Green 2-6-4 is an interesting repaint, it arrived last week and needed no work apart from a quick oiling. It'll look great pulling a rake of southern green coaches and who cares if they never actually painted them that colour in real life?!


My Silver King, as previously mentioned, was also in the biscuit tin of scrap locos. The tender was missing and the body paintwork too badly worn. I sourced a replacement body and tender but as they were sourced separately I ended up with a gloss body and matt tender. The paint quality wasn't that great either so when another body and tender came up for grabs I took the opportunity. The only minor problem was a missing handrail, which was quickly pinched from the old body.

Looking forward to giving these a good run next weekend.


Thursday, 24 January 2013

Another save...

                                      

So this arrived today. Looks like a Wrenn body, which is fine as they sit perfectly on the Dublo Bo-Bo chassis. So now to find a suitable chassis...





Whilst this model may look fine, it isn't! It's one of the collection of "interesting" re-hashes that I've mentioned before. One of them has already been reborn as another Deltic and as much as I like this model, the body doesn't sit properly and there are no body fixings, it's just sitting on an extended Bo-Bo chassis. I think this is a Lima body but I'm happy to be corrected.




...So after about 30 minutes, the class 20 is back to being a class 20, with a nice shiny body. Not exactly genuine Dublo but it'll run like one!



Sunday, 20 January 2013

Keeping it simple...

Spent several chilly hours in the loft preparing the portable layout for its next outing in February.

This means removing all the DCC bus wiring and reverting everything back to good old DC. Sounds simple but with the volume of electric points I had added, plus the need to simplify the layout at one end (trains couldn't get into some of the platforms without derailing) it ended up taking ages.

After much head scratching I decided to tone down the amount of electric points used, to keep them all would require hours of additional wiring to install the track isolation and signal control. Some will be retained for the station area where the signals are, and for some sections where it can be difficult to operate them manually. All the rest have been removed and I'll make use of them in the loft layout.

I needed a complete rethink of the main station, the outer line ran right at the edge of the boards, this means that derailments along this stretch could potentially be very costly if they fall over the edge - not great for public display either. I also wanted as little disturbance to the radius of the curves as possible and avoid using points right after a corner - this is where all the problems arise. The points are now located before the bends when the trains approach, this should make everything run much, much smoother than before.


So the track has now been relaid, from 6 down to 5 lines, the 5th will also comprise the TPO apparatus. I used spare track as a setting guide, with a spirit level to keep everything nice and straight.


Sadly the loft floor is the only space in the house big enough to allow me to couple the three end boards together. 

Doesn't look much yet but add in some station buildings, footbridge and signals...

Saturday, 19 January 2013

Tank engines (you can never have too many)

Left to right: Repainted Southern body  fitted to the newly repaired chassis. A genuine Dublo LNER tank. A 2 rail acquired from a friend's deceased relative, restored to 3 rail running. Finally another original genuine Dublo tank.

So I now have four operational 0-6-2 tanks in my collection.

After sourcing another loco listed as spares / repairs, I finally found a decent chassis to pair up with my green southern repainted body.

The loco had a dud armature, not surprising as all three axles were pretty tight, so a good clean, grease and oil plus a new magnet and second hand armature got it up and running and sounding quite sweet.

Once finished, I decided the give the other green 0-6-2 some attention is it was running quite slow by comparison to my latest repair. A quick blob of oil to the three axles was all that was needed. They double-head perfectly!


I then decided to try double-heading with the other two 0-6-2s and found they were also significantly slower and noisier than the others. More oiling and tweaking of the worm gear solved this, along with some minor adjustments to the brush springs.

I even managed a triple-head but this isn't recommended, the A3 wasn't that happy and power had to be applied carefully.

Just need a couple of new front couplings to finish.



Monday, 14 January 2013

What I got for Christmas...

This almost feels like writing up my news on the first day back at school after a Christmas break!

So Father Christmas worked his magic again - I must have been good!

No locos this time, just as well really as there's a mounting pile of "projects" awaiting my attention, as well as continuing the work on the loft layout and re-doing the portable layout one last time before its exhibition in September.

So, I'm now the proud owner of not one but TWO, DOUBLE level crossings! - Something Dublo never made. One has been sourced from a supplier of "neverwazza" items and the other is more bespoke. Basically my brother sourced a single crossing on Ebay and set about modifying it and having it sprayed. Apparently it was a team effort but it looks great. I'll get some pictures of both crossings next time I'm in the loft but I've already decided that one will be installed permanently in the loft layout and the other will be shown in the portable layout, I'll modify the layout to accommodate it if I can't find a suitable spot!

Really pleased to have these in my possession, I have a few single crossings but nowhere to put them so both of these will come in handy.

Work wise, nothing much has happened in the loft for a while. Combination of high workloads and tiredness means that when I have been in the loft I've basically just been playing trains or trying to tidy up. I still need to complete the inner loop and wire all the points so I've had to contend with running a simple goods train with 80033 & 80054 doubled-heading. Quite satisfying to see these run on an A3 but demonstrates the benefits of ensuring that the locos run faultlessly. I can't praise Neo magnets enough as they make a huge difference to the current draw.

No work done on the two 0-6-0 locos I acquired before Christmas, still a bit of head scratching as to how I'm going to mount the third rail skate underneath - I haven't been beaten yet. There's also another Bachmann project (or two) to come...

Wednesday, 5 December 2012

Progress update

Haven't had many opportunities to get up in the loft recently, plus it's quite chilly up there.

The eBay purchases arrived, one of which, although advertised as spares or repair, does actually run. Haven't spent much time on these yet, still looking at the best way to convert the 0-6-0s to three rail running. Not sure if it's easier to use Marklin skates or Dublo ones.

Meanwhile I've now laid 2 running loops and down one side of the layout these run into four, with an additional fifth centre line which I will leave for further expansion at a later date. I also added more sidings and started building my terminus, firstly checking that the locos could enter an exit without stalling or derailing. So far, the Deltic, Diesel Shunter, 0-6-2 tanks, 2-6-4 tanks, 8f and even the Bachmann EPB have all managed to exit the terminus, run round the outer loop and back into the terminus again without fault so I'm happy!

There are no diagrams of the proposed layout, although I consider myself to be reasonably pc literate I find it easier to just loose-lay the tracks on the boards. I decided to use a mixture of manual and electric points, the ones near by will be easier to leave manual - less wiring, less modifying, less hassle!

Still plenty of work to do but with the weather chilling off and Xmas fast approaching I don't envisage much more progress in coming weeks...

Monday, 19 November 2012

New additions...

Transplanted one of the Co-Co chassis from the job lot of "interesting" conversions back into a proper deltic body, this means I now have 3 operational deltics!

Ordered some ringfield neo magnets and once these arrive I'll do a motor swap with the noisy Co-Bo Metrovick.


I've also snapped up a rather nice looking 0-6-0 steam loco and have another on watch, both non-runners. I've never seen one of these close up and it will be interesting to see firstly why they're not working and then see how easy they are to convert to 3 rail running. I'm not aware that Dublo ever made these in 3 rail, hopefully I can use the pickups that will be left over from the redundant deltic chassis once  I've pinched the motor out of it for the Metrovick! The 0-6-0 only cost £16 so would be nice to get it running.


Elsewhere in the loft I've made a start on clearing space for further track laying and decided to abandon my idea of 4 loops in favour of 2, this will make the layout far less complicated and reduce the number of diamond crossovers. Also if I'd gone with 4 tracks I would have ended up installing points in locations that aren't easily accessible, so these sections can be left with just straight sections of track. I've mocked up a great idea for a terminus and some extra sidings. I don't tend to draw these things or use planning software, just gold old fashioned track laying.
I've now sold all the DCC controllers, booster and the decoders I'd removed from the locos, along with the decoders that were still in their packaging. Very pleased with the amount of money raised, I managed to make a small profit on the select and the elite as these were second hand purchases. I did of course lose out with the decoders and the power booster but with Christmas fast approaching, every little helps...

Tuesday, 6 November 2012

Pictures from 3 & 4 November weekend

Old & new - the Bachmann 2EPB ran faultlessly all weekend. Here it's lined up next to the Dublo SR EMU, with Dorchester to the left, next to that Bo-Bo D8000 waits to leave with a goods train, Bristol Castle heads up the TPO coaches and finally the Bachmann 4CEP is in the background.

The road to the far right is way too close to the edge of the board and will be removed before the next run.

Dorchester waiting to take power

Dorchester from the other side of the tracks, the back of the goods train and TPO set also visible, although the goods train had shed its guards van!

Rear view of the Bachmann 4CEP

Same location. The road the CEP is parked in turned out to be practically un-usable due to too may twists & turns entering and exiting so a revamp is needed.

Waiting for a clear signal

Illuminated and ready to go

The sidings and turntable, with newly streamlined entry avoiding some of the twists & turns that had been installed previously. Sadly the girder bridge didn't arrive in time, which resulted in the piece of track in the foreground crossing the two board sections unsupported.

The far right track section has now been removed along with the crossovers and several sets of points. The twin curves will simply shift over to the left by 1 track and turn what is currently a long siding into the inside running loop, with the current inside loop becoming the outside loop (make sense?)

The many points and crossovers proved problematic, there are more points and crossovers installed further down on this section and derailments / stalling were common, even with proper Dublo stock.

Lined up in the sidings - Diesel shunter, 0-6-2 shunter, Bachmann class 25, Cardiff Castle (with broken coupling) and 8F 
Zoomed out view, with the non-functioning Co-Bo

Different angle

Main station layout again - 6 roads but will be streamlined shortly


Wednesday, 26 September 2012

DCC Conversion - How I converted a Ringfield motor

**Disclaimer** I am in no way a professional and accept no responsibility for anyone who chooses to follow this guide or trashes their beloved pride & joy by following the steps below. This isn't published as a guide, it's purely to show how I converted the loco for DCC operation.

The Ringfield motor can be found in later 8F's, Castles, Westcountry class and many Wrenn 2 rail locos, as well as my little diesel shunter here.

You will have to drill out the end cap of the motor to convert a Ringfield motor to DCC. You will also need a decent soldering iron. Mine is 60w - I found that the cheaper soldering irons aren't man enough for some of the dublo soldering jobs.

So this is how I converted my diesel shunter, with Ringfield motor, to DCC:

Diesel Shunter, casing screw removed, ready for dismantling
With the casing removed, it's time to remove the electrics & brush springs, followed by the 4 retaining screws that secure the motor end cap to the chassis - I've also removed the motor bearing to avoid any metal filings ending up inside the bearing when I drill the end casing later...

Motor end ready for removal

Now with the end cap removed from the chassis, the un-insulated brush holder needs to be removed...

End cap removed
I use a brush holder plug from a scrap Dublo loco to carefully push out the brush holder, using a pair of long-nose pliers...

Dublo brush plug inserted into the brush holder from inside, ready to push out the holder

...And it pops out quite easily...


Brush holder removed, undamaged so it can be re-used!

This is the point of no return, so unless you're 100% certain that you want to convert then STOP NOW!



In the vice, ready for drilling

I used a 6mm drill bit to enlarge the hole ready for the new insulator...


New insulator, sourced from the internet

Once drilled, I carefully press the insulator into the end cap...


Insulator fitted

I then need to refit the brush holder, I used the vice to do this bit, slowly & carefully pressing the holder into the insulator...

Pressing the brush holder back into place

Voila!

Perfect!

At this point I test to make sure that both brush holders are electrically isolated before I refit to the chassis & fit the brushes...
There should be no resistance between the brush holders & casing, if there are then remedy this before proceeding any further.

I've now re-assembled the motor, brushes and retaining springs, time to check again for resistance to earth...



Before fitting the DCC decoder, I decided to run the loco on DC to ensure smooth running. A neo magnet has already been installed and as I previously removed the end bearing, I need to ensure that it's correctly adjusted. If the bearing is too tight then not only will the motor not run properly, it will also draw more current, potentially damaging the new decoder...


A rather crude method of testing the loco on DC prior to installing the decoder.

I'm satisfied that all is well so now it's time to install the decoder - This is where a good quality, high temperature soldering iron is a must, the connections to the brush holders need to be done quickly so as not to melt the plastic insulators.

Also worth noting that I've removed all traces of the original electrics. 1 of the 4 end cap retaining screws is also used to earth the brush spring to the chassis via a metal strip (in the below pic it would be the top right screw) which can easily be seen once all 4 screws are removed. This is discarded prior to re-assembly.


The decoder soldered in. I only need 4 wires so the remaining wires are cropped and secured inside heat shrink, just in case I want them in future.

Re-assembled and ready to be programmed. At the moment I haven't set up a proper programming track so for writing the loco address I use the Select controller as there's no need to keep swapping the wires!

When I come to checking the CV's I'll use the Elite controller.


Ready to go!

So after a quick blast round the loop, time for a little slow shunt...



Space is very tight in the diesel shunter, the chip is a very snug fit and has resulted in the case not fitting as flush as it did, I can live with it but purists may not be entirely happy, however a purist would probably have left it on DC!