Tuesday, 11 February 2014

Transfers

I've had these for ages.

I made a Royal Mail sorting coach a while ago using transfers supplied by eBay seller lhp media.

I used the same supplier for the recent restoration of the 0-6-2 tank engine and after some tidying of my office, I found the other transfer sets that I'd bought and subsequently lost.

These are fitted to some of my less-pretty Dublo tinplate coaches, all of the coaches used had either rusty roofs or damaged paint.

The roofs were removed and painted with halfords grey primer, with two coats of clear lacquer to make them shine. After the sides of the coaches were given a light sanding, the transfers were applied. I then added a coat of lacquer to these to add more shine but this has to be done carefully due to the design of the transfers.

So after very little effort, I now have another Royal Mail sorting coach to add to the mail train and two coaches to add to the breakdown crane. More importantly, four rusty and play worn coaches that would have never seen any use have been salvaged and will have prominent positions on my layout.


The roof of the final breakdown crew coach is still drying!





Monday, 10 February 2014

Storm damage

It's been raining a bit recently...

Thankfully no major flooding round these parts, however I do store the boards of the portable layout at the back of my garage. Mindful of the fact that the garage is only single-skin brick and southwesterly facing, I keep the boards stacked off the floor and away from the rear wall.

BUT... The rear section must have fallen against the rear of the garage and when I checked it earlier today, one section was soaking wet and mouldy.

I had intended to carry out some remedial work to this board by cutting and wiring the tracks together like I've done with one of the other hinged boards. The idea being to make it quicker to set the layout up and pack down without having to remove so much loose-laid track.

Although I'd planned to eventually upgrade this section of the layout, I don't have the time, money or enthusiasm to have this completed by this weekend. I tried to chisel out the blown section in an attempt to get the tracks to level out but in the end I realised that I was wasting my time.


Thankfully I found a near-identical piece of MDF in the loft...


So the damaged piece was unscrewed & removed and the replacement slotted in. I also managed to find a scrap piece of grass mat and after some more searching I found the PVA glue...



Time to relay the track. I had experimented with this section previously with fixing all the track down but had never trimmed the track to size, leaving a big overhang of track on one side when folded up, which then got bent and eventually snapped off.

I had envisaged having to cut the tracks level with the ends of the hinged sections but after some tweaking with the 1/4 sections of track that were already on the board, I managed to get the two ends close enough to the edge to avoid further cutting.

After a quick solder job underneath, the tracks were screwed back down...


At the moment, the tracks line up perfectly without the need for adding cut-down fishplates. I'll keep some in reserve just in case I need some at the weekend.

A brief run over both sections using my recently acquired brick wagons confirmed that both sections were fine...



I'll leave this section indoors to let the glue dry properly. The rest of the boards look to be ok but I guess I'll only know for sure when they're all set up on Saturday.

Fingers crossed.



Saturday, 8 February 2014

Early attempts at three railing


You have to break a few eggs to make a good omelette.

Here are a few of the "eggs" from my first attempts...


Dapol class 155

I travelled on these during their very brief appearance before being sent for conversion into 153s and wanted one for the layout. Sadly there isn't really enough room under the bogies for a proper skate so flattened brass paper fasteners were used. It didn't really work and while it will still run in a straight line, it doesn't do points or corners due to the down-force exerted by the pick-ups. Maybe one day I'll get it running.



Lima class 33

I wanted a 33/1 due to my Southern region upbringing and this is the closest I've got so far.

Again clearance underneath was an issue, this has two small copper strips that were originally the two rail pick-ups from a hornby pacer. It runs but won't pull much more than its own weight. Possibly can be resolved by adding ballast.

 


Class 142 Pacer

The only three rail pacer in existence? - ironic really considering that in real life these things are banned from third rail areas!

My first three rail attempt of modern-ish stock. Bought cheap on eBay with broken couplings. These two carriages are joined together by connecting wires with a single Castle class plunger at each end. Although the springiness of the plungers reduces the downward force, this actually runs quite well and was used a fair bit on the portable layout when I first built it and had very little running stock. 

These days it's hardly used and I couldn't bring myself to exhibit this in public!





HST

Just about runs but won't pull more than three coaches. Another conversion using brass paper fasteners and there isn't much clearance under the bogies. Fine on track without too many points, so doesn't get much use now.


Thursday, 6 February 2014

Finished!

The front coupling for my 0-6-2 tank project arrived today, so I wasted no time in heading for the loft to attach it to the loco...


It ran without fault and happily keeps up with the other tank engines, which is handy for double heading. Admittedly it's very glossy and the red paint on the buffers could have been done better but for someone with zero artistic skills I'm really happy with how this turned out. I don't have the heart to sell it so once again I'm adding to my existing collection!

Monday, 3 February 2014

Minor mishap

My smugness and self-satisfaction levels after the repainting the 0-6-2 tank were very short-lived!

After checking the pictures that I'd uploaded I decided to go back and repaint the buffers again... Big mistake!

Sadly as I took the brush from the pot of red touch-up paint, it dripped... right on top of the roof of my lovely, newly painted loco. And of course the lacquer coat was still a bit tacky so this got ruined!

Thankfully it didn't land on the stripes and I was able to rub down and repaint the cab roof and re-lacquer. All is now well.

I also finally got around to sorting out Dorchester. I decided to fit a brand new set of brushes, this cured the problem as there was no visible sign of any issues with the brush springs. Both locos run happily along the test track in the loft and they'll get a proper run-in next weekend. Hopefully by then I'll also have sourced a new front coupling for the tank engine...


Sunday, 2 February 2014

My first go at repainting a loco


I have loads of 0-6-2 tank engines and really didn't need any more, I have reasonable examples of the two most common versions and acquired several repainted bodies, which I've combined with refurbished chassis over the years.

One of the things I've never attempted is a loco repaint. Now it's fair to say that my talents really lie in the mechanical side of things rather than cosmetic but with a fair collection of scrap loco bodies piling up, and the recent acquisition of two more, rather sick looking 0-6-2 tanks (and the 2-6-4 that I already restored with a replacement body) I decided to have a go at repainting.

The loco body had been stripped a while ago when I did the platforms using an overnight soak in oven cleaner.


After a soak and rinse, I ended up with a stripped body.


The body was then primed using halfords grey primer, then it got left for months!


Having finally found some enthusiasm to finish what I'd started, I then applied two coats of black.


After being left to dry, it was time to apply the transfers. These were sourced from eBay about three years ago from lhp media. They arrive on a sheet and require cutting out and applying.





And this is the finished result, I added lacquer to give the loco a nice glossy finish, also because there was a notable difference between the finish of the loco paintwork and the finish on the transfers. Finally the red inserts were painted in front and rear.

It will be reunited with its chassis, which has already been restored, just need a new front coupling and screw as these were missing.

I can't say that this is something I'd consider doing much of and the idea of restoring something like a duchess or A4 body is something that I think is still way beyond my abilities, but I'm happy with my first attempt and it's nice to see another loco that would potentially have been scrapped saved from this fate.








Monday, 23 September 2013

Pictures from Blandford show, September 21st & 22nd

Turntable leading to the steam loco sidings

All the steam locos lined up, with Canadian Pacific in the foreground.
The only loco that didn't move all weekend was Cardiff Castle, which still has a broken coupling.

Brighton Belle sits in one of the sidings.
The three centre cars are Dublo Pullman coaches but looked reasonable sandwiched between the two driving trailers.

The two Bachmann EPBs.
Both ran without fault over the old three rail track.

The station end with the newly extended and repainted platforms (main station building still needs the windows & doors painted)
A pair of Class 20 Bo-Bo's pulling the oil tankers while my newly restored 2-6-4 tank with its shiny LMS body hauls the mail train.

New addition, Royal Scots Grey sits in the siding with the other class 20/

My new, bespoke four track level crossing at the end of the main station.
Dorchester hauls a rake of Southern green coaches while one of the Co-Bo Metrovicks hauls an 8 coach train.
The back of the goods train and mail train also in the foreground.

Old vs New.
Dublo SR EMU and Bachmann class 105 sit in another siding.
The EMU saw regular use throughout the weekend, stopping only briefly due to a broken wire.

Another station view, from the other side of the layout with the newly modified footbridge.
Slight colour difference with the new level crossing that I may address at some point.

Co-Bo Metrovick at the head of its train with Dorchester to the right.

Layout viewed from the front looking down along the sidings and turntable area.
Two A3 controllers for the main loops with another A3 controller further along which controls all the sidings.

Front view of the main station area.

Looking at the back of the layout towards the front.
For a bit of fun, we coupled two of the Deltics together and hauled 17 coaches. The head of the train and the rear of the same train are visible here.

Rear station as the 17 coach train passes through.
The EMU has now moved to one of the platforms while the Brighton Belle takes a rest in the sidings along with the Diesel shunter and a small rake of wagons.

Another view of the steam sidings.
The GWR green 2-6-4  is another recent project, now in full working order.
Original post here:
http://dublonutz.blogspot.co.uk/2013/08/next-project.html

Sunday, 22 September 2013

Show's over!





After months of preparation, it was all over in a flash - two days of solid train running and trying to keep two running loops in constant use, not easy at the best of times but throw in old stock and old track and there will always be derailments, un-couplings etc. Very difficult to hold a conversation with people who take an interest in what I'm doing while also keeping an eye out for things going awry.

As for casualties... there weren't really any - Just a broken wire on the SR EMU which was re-soldered within 10 minutes and a minor fault with the brush spring on Dorchester that will need some further attention. City of Birmingham was rather under-powered, I suspect this is a magnet problem as it seemed barely able to pull much more than its own weight and was stalling rather than slipping. The neo magnet in this one is different to all the others I've used and was in my previous Gresley chassis, which was also under-powered. I'd also forgotten to check the tyres on the surviving green Deltic - two were missing and the other two were too big, so this one spent the weekend in the sidings, along with Cardiff Castle as I ran out of time to replace the rear coupling.

Everything else held up really well and it's so nice to come home with the box of rolling stock in complete working order.

Nice to see so many people taking an interest in my layout, we never intended to show it and it's debatable whether it will get another public showing for a while.

None of the steam locos would double-head using the old A3 controllers, they just couldn't cope with the power consumption. Even powering up slowly wouldn't do it, however the Bo-Bo's, Co-Bo's and two of the Deltics weren't a problem at all. Personal favourite moment of the weekend has to be the double-headed Deltics pulling a rake of 17 coaches, which they managed with ease - after around 40 minutes of running, both Deltics were just warm, not hot to the touch and it was great to see my new Royal Scots Grey get a good run.

Brighton Belle also performed really well, great considering the amount of time that's gone into trying to make it run properly on 3 rail. I  sandwiched 3 Dublo Pullman coaches between the two end cars to re-create the 5 car Brighton Belle set, of course the names and numbers don't match the real thing but when it's running it was hard to make out - only a BB purist would know!

The portable layout is now safely stored away ready for its next outing at the end of October. As I spent so much time and energy getting all my rolling stock in good order it means I have very few projects to distract me from working on the loft layout and now that Autumn is nearly here, it's a bit more comfortable working in the loft.

Deltics in action with 17 coaches...


Lots of pictures to upload shortly.

Saturday, 21 September 2013

Show time

Well, everything's set up ready for the weekend.

Thankfully the portable layout, having not been touched since the last run, went together with no problems and both loops fired up without a single track fault.

I've worked out that there's about 40 different items of locos and multiple units to run and my Brighton Belle will get its first public outing after months of trying to work out how to convert it.

So far the two EPBs have been in use, with their flat Marklin pickup skates they make a great job of cleaning the centre rail and after a few laps they were running fine.

Will be nice to have two solid days to run the existing stock and the new additions, we'll need to ensure that we rotate the locos frequently as some of the older locos can get quite hot. I've no doubt that there'll be casualties over the weekend but hopefully we can keep these to a minimum.

Here goes...

Monday, 16 September 2013

Double footbridge

Having seen these at other shows, I wanted a double footbridge of my own.

Having been gifted this one as a birthday present, I realised that for the loft layout I actually needed two of them.

Thankfully over the years I'd gained a number of single footbridges in various condition, even a nice boxed one so obviously this wasn't a candidate. I did however find two that were looking a bit sorry and using the one gifted to me as a guide, I managed to carefully hacksaw, file and respray my own.

After some careful hacking...


Test fitting...


 Priming...



This is the final result...


I ended up using a whole tin of Sahara beige on this footbridge alone and even after priming, it needed three coats of top coat.

I'm happy with the final result, it will match perfectly with the platform sections I recently completed and should give my main station a bit of a "wow" factor.

Halfords must be wondering why there's suddenly been an upsurge in several of their stores for a paint that was used primarily on 70s Cortinas!


Sunday, 15 September 2013

Finishing touches

Still busy trying to finish off as many projects as possible before the public showing next weekend.

Just waiting for the paint to dry on the footbridge before I reassemble it, ordered and fitted a replacement bogie for the VEP that has been broken for ages, still waiting for the tyres to arrive for the Co-Bo and the Brighton Belle and finally got around to 3 railing the other Bachmann DMU that I bought last year...


It's a class 105 and in its green livery it won't look too out of place. Seems to have issues with one of the corners on the loft layout so I'll try it on the portable layout before going too much further with my investigations.

After bidding, and losing on several platform extensions I've given up and decided just to run with what I have already. The extension pieces are fetching eye-watering sums of money, my method of buying scrap platforms and removing the buildings is working out to be way cheaper.

Most of the rolling stock is now boxed up ready for next weekend. Hopefully the tyres will arrive in time.

Wednesday, 11 September 2013

Brighton Belle progress

I've wanted a Wrenn Brighton Belle for some time but in good condition, these fetch ridiculous sums of money.

I finally got my hands on a reasonable two car set about 18 months ago and attempted (and failed) at three railing it. Since then, and after an aborted DCC attempt, it's lived in several boxes completely in bits.

So today and with next weekend's run in mind, I decided to take another look, and make sure all the spares were accounted for.

One of the reasons why I wanted a Wrenn version was that i thought it would be an easy job to convert to 3 rail running... Not so.

After much head-scratching and trial & error, I realised that the only place that the 3rd rail pickup can be fitted is in the rear bogie, for which there isn't enough room.

Drastic measures were called for, so out with the reamer...


Not for the faint-hearted and no turning back. Yes it probably de-values the unit but it's mine and not for sale!

After much reaming of metal and with metal filings everywhere, there's enough space to mount a Marklin skate. This is where it gets fiddly as I've used the spare hole drilled in the bogie to bolt the skate in place. Trouble is once the skate is in place, you can't screw the bogie to the chassis.

So the bogie gets screwed into position first, then the skate gets bolted in and the live wire soldered to it. I had to ream out even deeper to mount the bogie securing screw so that it didn't interfere with the pickup skate, then I had to shorten the bogie securing screw and the fixing bush to accommodate for the new, shorter length. For extra neatness I drilled another small hole in the top of the bogie to feed the live wire through to the pickup. Should this require maintenance in future then it's going to be a pain as the pickup will need to be de-soldered, then unbolted before the bogie retaining screw can be removed.

The bogie could do with a quick coat of primer and black paint but for now and with another weekend run coming, this will do...


After doing all that it was finally time for a test run. That didn't go well.

I've read on numerous forms the difficulties with the Brighton Belle and the common problems associated with poor running. This one was no exception - judders, stutters and completely stopping on points & crossovers. I know the Marklin skate can cope with them as they work fine on my other stock. Of course this unit still had its 2 rail wheels, complete with isolated wheels for the original 2 rail live pickup.

Worse still, the motor bogie has two wheels fitted with tyres. After some more head-scratching I worked out that the best option was to replace the wheels with a set that I had left over from scrapping one of the spare Deltic chassis. The dimensions were the same, only major difference being that the original Wrenn wheels are silver, whereas the Deltic ones are painted black. Not a huge deal as once the side rails are installed, the wheels can hardly be seen!

After further testing, I still wasn't happy with the results - the unit, even running alone, was prone to slippage and derailments so I tried fitting the motor bogie with 4 tyred wheels for extra traction. This worked reasonably well but highlighted once again the issue with some of the replacement tyres I'd been using a while ago. Basically the tyres lift the wheels off the track, that reduces the amount of contact with the rails and causes the derailments. So another set of the small Marklin tyres have been ordered, these once stretched give great traction but due to their tiny size, more of the wheel will be in contact with the track.

Even in its current formation it runs reasonably well, current return is now via all 8 wheels. 

I'll leave fitting the side rails to the motor bogie until the tyres arrive.


I have to say that in all honestly, the Wrenn Brighton Belle is a big disappointment. I expected the build quality to be better and whilst I can't grumble about how hard this one was to convert to 3 rail operation (as it was never intended to be) I have to say that of all my stock, new and old, this is by far the noisiest piece of rolling stock! 

I've checked the bearings and given it a light oiling but still it seems incredibly loud compared to the rest of the fleet.

The plastic bar that the motor bogie screws to snapped as soon as I removed it, so I fabricated another one using a cross bar from one of the scrap Deltics, straightened it in the vice, then cut and drilled to size. Seems to have done the job and adds a bit of extra weight to aid traction!

I wonder if there's an alternative motor bogie that would fit...

Monday, 2 September 2013

Painting progress

Most of the platform repainting is now finished, while I was at it I took the opportunity to repaint the tops of the signal boxes, again the main paintwork is reasonably good and I'm not skilled enough to re-colour all the doors and window bits, so repainting the top will have to do.


Top of the signal box after it's top coat, still masked up...



All done...




Halfords grey primer makes a great base coat for the tinplate coaches, I had 4 coaches with rusty roofs so after a quick rubdown and two coats of primer, I then applied two coats of lacquer to make them look like this...



With most of the work done, I couldn't resist a quick mock-up on the loft layout, the station area here can't accommodate a longer platform than two sections plus ramps, hence why I want the waiting rooms and other buildings to be separate from the platforms so that I can centre them up when in the loft, and re-position them when using the portable layout...



My new, "neverwazza" double footbridge in the background, more to come on that...




Happy with progress, it's nice that the platforms all match. Should make the portable layout look much better with a nice big station.



Royal Scots Grey

At present, the only rolling stock that I have duplicates of was the Green Deltic, and as they aren't actually numbered it wasn't a high priority to sort it out but I had always intended that one day I would try and either get the existing body repainted or source another. I'd been hoping to find a St Paddy as these go for silly amounts of money but when this appeared on Ebay, I snapped it up...




The body and paint are in reasonable condition so it was quickly swapped with the existing green body, what this means is that this particular Deltic is now composed entirely of spare bits.